The installer can have the receiving door back on its hinges by four, and the night crew can still find themselves locked out if nobody booked the technician who reconnects the card reader. That’s the sort of detail I’d want settled when the quotes come in. By installation day, it may be too late to get both trades there at the same time.
Keep one copy of this commercial door replacement checklist for each opening. Put the door number from the schedule at the top, then write down the original complaint in terms someone can check on site. “Have to pull it shut to get it to latch” gives the installer more to go on than “replace receiving door,” and it tells you what to try before you close the work order.
Decide whether the existing frame can stay
Take the installer to the door while the people who reported the problem are around. Ask them to show you what happens on a normal shift. If the bottom corner drags, the installer can look for movement at the top hinge as the door opens, then check the frame for damage or misalignment. A loose hinge or worn hardware may be repairable. A jamb that shifts under load needs further investigation before you order a leaf to fit it.
Ask for the scope in writing once you know what can stay. If one quote includes the frame and the other covers the door alone, look for who will remove and dispose of the old frame, patch the wall, and touch up the finish. Put a name next to each of those jobs. Otherwise, you can accept a price for a commercial door and discover on demolition day that nobody priced putting the corridor back together.
Measure the opening the installer will actually work with
Use the shop’s field measurement sheet while the old door is still in place. A nominal size from the schedule, such as 3 feet by 7 feet, helps identify the opening. The shop also needs the actual leaf width, height, and thickness, the frame dimensions at several points, and the hinge and strike locations measured from the reference points on its sheet. Include the handing and a sketch of the swing. For a pair, identify the active leaf and show where any head or floor strike sits.
Check the flooring schedule before you send those measurements. The height of the tile and threshold at handover is what matters when the installer checks clearance under the new leaf. On an accessible route, have the clear opening, threshold, and maneuvering space checked as part of the proposed work. A change to the swing on a required exit route also needs review before you release the order.
Confirm the fire rating before anyone cuts the door
Photograph any labels on the leaf and frame and file the pictures under the opening number. Have the required rating verified against the building documents and applicable code, particularly if the floor plan has changed since the original door was installed. When pricing commercial doors for a fire-rated opening, ask the supplier to check the proposed leaf, frame, glazing, and hardware as an assembly. Include any pieces you intend to reuse.
If the job calls for a vision lite or a different lock, bring it up before fabrication. Ask the supplier what preparation the shop needs to do and have any proposed changes on site reviewed against the assembly’s listing and applicable requirements.
Look at an exterior opening after rain
When an entrance leaks, take a photo before the floor dries. A wet line beneath the door gives the installer a place to start. If the water shows up at the base of the jamb or pools outside the threshold, ask the contractor to trace it before you choose a fix. Replacement commercial exterior doors can be priced with new seals and thresholds but work on the frame or drainage may need a separate line in the quote. Agree on who will handle it while you’re still comparing bids.
Set the installation date around the parts and the people
Send the make and model of any closer, strike, or exit device you plan to keep to your commercial door supplier so the shop can check compatibility with the proposed door. Ask which part has the longest lead time, including any hardware supplied by another trade. When there’s a reader, put the person who disconnects it and the person who restores and tests it on the same schedule. Give a date once you know both can be there and review any temporary arrangements for required exits before the opening goes out of service.
Try the door before you close the work order
Bring the original complaint to the walk-through. If the crew used to pull the door shut, let it close and watch the latch engage without a hand on the handle. Have the installer demonstrate the exit hardware and the access control technician test the reader and lock. Arrange any inspection required for the rated assembly.
Before you file the job, note which parts were reused and save the hardware models, label photos, and inspection records under the opening number. The next person called out for a failed closer will be able to see exactly what was fitted without trying to identify it from a photo taken from the floor.