Featured Partners

FSU Logo

Adart

apvcoatings logo

new logo

Wolverine Construction

LVC Logo

Hunter logo

Noritz Pre-Assembled Racks Cut Tankless Heater Install Time

Noritz Pre-Assembled Racks Cut Tankless Heater Install Time

Noritz America, a leader in tankless water heaters and high-efficiency combination boilers, has unveiled a new series of five pre-assembled manifold and rack kits to provide a faster, easier way for contractors to build their own wall-hung or floor-mounted water heater solutions on commercial job sites. The goal: To make tankless water heating a compelling option for installers and end users, whether the application is for new construction or even emergency storage-tank water heater replacement.

Designed, engineered, and assembled by Noritz in its own U.S. facilities, the new CMK Manifold and CRK Rack Kits offer all the components needed to fabricate a floor-standing or a wall-hung system for tankless water heaters.

CMK: The Commercial Manifold Kit is available in three wall-hung configurations for supporting either two (Model No. CMK-SS2), three (-SS3), or four (-SS4) Noritz NCC199CDV commercial condensing tankless water heaters, which must be purchased separately. The kit includes the following pre-assembled items:

  • two-inch hot-water copper manifold
  • two-inch cold-water copper manifold
  • two-inch black-iron gas manifold
  • three-quarter-inch PVC condensate manifold
  • two wall-mounting brackets

All other necessary components — sweated and threaded fittings, flexible connectors, bolts, etc. — are flat-packed with the manifolds and brackets in a single box that contractors will find easy to transport and carry onto a job site.

CRK: The Commercial Rack Kit is available in two floor-standing configurations: the CMK-BB2 for handling two NCC199CDV units and the CMK-BB4 for mounting three or four NCC199CDV units.

For floor-standing applications, an installer would receive two boxes: one containing all the manifold and component materials for assembling either the BB2 or the BB4 configuration; and a second box containing a set of lightweight but rugged aluminum frames for creating the base to mount the entire assembly.

 

 

 

 

Feature Image Courtesy of: Noritz America

Share this post :

Facebook
Twitter
LinkedIn
Pinterest

Stay close to the industry.

CCR updates, digital magazines, events, and partner insights.

Current Issue — CCR #10

Editorial & Third-Party Content Notice: Articles, press releases, company announcements, and accompanying media (including photography, graphics, and video) published on this site may be provided by third-party contributors, PR representatives, or wire sources as cited. Authorship and original copyrights remain with their respective holders.

Commercial Construction & Renovation is a registered service provider under the Digital Millennium Copyright Act (DMCA). To submit an inquiry, copyright claim, or formal takedown request, you may view our registered agent listing and official contact details via the U.S. Copyright Office DMCA Designated Agent Directory, or contact our compliance desk directly at publisher@ccr-mag.com.

Receive the CCR 2024 Idustry Report

Get ahead of your Competitors with CCR's FREE Industry Insider's Report 2024!

Always stay two steps ahead of your Competitors. Stay informed with the latest in the Industry. 

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

This site uses cookies to ensure that you get the best user experience. By choosing “Accept” you acknowledge this and that ccr-mag.com operates under the Fair Use Act. Furthermore, Changing privacy laws now require website visitors from EEA based countries to provide consent in order to use personalized advertising or data modeling with either Google Ads & Analytics. Find out more on the Privacy Policy & Terms of Use Page and our Editorial & DMCA Notice.