Choosing a design partner for a commercial fit-out in Hong Kong is as much a procurement decision as a design decision. Visual quality matters, but the programme is also shaped by statutory submissions, landlord approvals and sector-specific licensing. A studio that cannot plan those steps may create delays, even if its design work is strong.
This guide is for owners, asset and facilities managers, and project leads working across retail, food and beverage, hospitality, offices and healthcare. It explains what to assess before making an appointment and which claims to verify through official records.
Start with statutory competence
Interior design is not a licensed statutory role in Hong Kong. Depending on the scope, a project may require an Authorized Person, a Registered Structural Engineer, a Registered General Building Contractor or a Registered Minor Works Contractor. Design capability does not replace these appointments, and a credible studio should identify the likely requirements early.
Under the Buildings Department’s Minor Works Control System, works are divided into three classes with different control levels and seven work types. Class I Minor Works require prescribed building professionals and a prescribed registered contractor. Classes II and III require a prescribed registered contractor. Forms MW01 or MW03 must generally be submitted at least seven working days before Class I or II works begin. The relevant completion certificates for Class I, II and III works must be filed within 14 days after completion.
Ask each studio to identify the professionals and contractors it expects to involve, then check those names in the Buildings Department registers. The registers are available for public inspection but do not represent government recommendations. Membership of an organisation such as HKIDA is a professional affiliation, not a statutory licence.
Check sector licensing and landlord experience
Sector experience becomes especially important when a business needs a licence. For food premises, the Food and Environmental Hygiene Department requires proposed layout plans at a scale of not less than 1:100 as part of a restaurant licence application. The licence is issued only after the applicable requirements have been met and the fees paid. A studio familiar with this process should be able to prepare the plan set in the required format from the start. For projects needing interior design and decorating without a full renovation, an interior design studio Hong Kong is an example of a furnishing- and décor-first scope alongside limited construction.
Landlord requirements run alongside government approvals. Shopping centres and office buildings often have their own submission formats, review periods, construction rules and reinstatement conditions. Ask how the studio managed a recent landlord review, who maintained the comments register and how outstanding items were closed.
Understand digital submission capability
The Buildings Department launched Stage 3 of its Electronic Submission Hub on 30 June 2024, extending the system to plan submissions that include alteration and addition works. This makes digital document control increasingly important.
Choose a delivery model that matches the risk
The appointment structure determines where responsibility sits. A design-only appointment leaves the client to tender and manage the building work. Design-and-build places more responsibility with one provider but may offer less visibility into individual prices. A decorating and furnishing scope avoids substantial building work and may suit a lighter refresh.
Whatever model is selected, define who produces tender documents and shop drawings, manages submissions and obtains the certificates needed before opening. Electrical additions and alterations must be completed by a Registered Electrical Contractor, inspected by a Registered Electrical Worker and certified on form WR1 before the installation is energised. Fire service installations must comply with the current Fire Services Department requirements and be supported by the applicable certification.
The appointment should also state the defects liability period, response times and snagging process. These details are easier to agree before work begins than after handover.
Assess sustainability and wellbeing capability
If a green building rating is part of the brief, introduce it during concept design. BEAM Plus Interiors v2.0 provides a framework for assessing commercial and institutional fit-outs. Early planning can affect material selection, mechanical and electrical loads, waste handling and the operational information required for assessment.
Ask candidates to propose a target rating and an initial credits plan covering materials and waste, energy and water, and health and wellbeing. Specification choices matter here, since demountable systems increasingly used in commercial fit-outs let panels be removed and reinstalled without waste when a space is refreshed. The plan should distinguish between practical measures and credits that would add significant cost or complexity.
Read a Hong Kong portfolio critically
Give more weight to completed projects than to renders. Look for evidence of coordination, including landlord approvals, submission records and completion certificates where they can be shared. Ask what changed during construction, how the team handled those changes and how the space performed after occupation.
Sector fit matters more than portfolio size. M Moser’s Hong Kong practice focuses on workplace environments, while Linehouse works across hospitality, retail, food and beverage, workplace and residential projects. Their experience points to different strengths and should be assessed against the brief rather than by project volume alone.
Use a practical procurement checklist
A request for proposals should test the issues most likely to affect cost, timing and opening:
- Which statutory roles are required, who will appoint them and whether they appear in the relevant Buildings Department registers.
- The team’s recent electronic submission experience and drawing coordination process.
- The licensing pathway for the sector, including plan formats and referral steps.
- Compliance with the landlord’s design guide and the process for tracking comments.
- Responsibility for WR1 and FS 251 certification, snagging and defects.
- The target green rating and proposed credits plan, if applicable.
- Fees, exclusions, deliverables and approval responsibilities at each project stage.
A typical sequence covers the brief, concept, schematic design, tender, submissions and approvals, construction, certification and handover. Whether the shortlist includes a multidisciplinary practice, a furnishing-led team such as MAD Studio or a larger delivery-focused firm, the responsibility matrix should be clear. For narrative-led spatial work, interior design HK is one multidisciplinary option to assess. Designers coordinate the work, while the appropriate registered professionals and contractors complete statutory duties.
FAQ
Do commercial projects always need an Authorized Person?
No. The requirement depends on the proposed work and the approval route. Class I Minor Works require prescribed building professionals and a prescribed registered contractor, while Classes II and III require a prescribed registered contractor. Alteration and addition works outside the Minor Works route may require fuller plan submissions to the Buildings Department.
What documents cover electrical and fire service installations?
Electrical additions and alterations are certified on form WR1 by the relevant registered electrical professionals. Fire service installations require the applicable certification, which may include FS 251, from a registered fire service installation contractor. Confirm the current forms and submission process with the relevant departments.
When should a BEAM Plus target be set?
Set the target before schematic design. This allows the team to account for materials, building services, waste handling and documentation before late changes make compliance more expensive.