Moisture control is the name of the game when it comes to keeping buildings in tip-top shape. Moisture inside the walls or in the ceiling of buildings can lead to black mold, problems with materials breaking down, and all kinds of other issues. You need to have moisture management in mind when you are working on commercial construction projects, just like you would when you are working on residential jobs.
Building envelope moisture control is the management of the water, vapor, and air movements through a structure’s outer shell. The outer shell is the walls, the roof, and the foundation. The goal of this kind of moisture control is to make sure that the indoor air quality is maintained while also ensuring that weather protection and internal moisture dissipation are possible.
Best Practices for Building Envelope Moisture Control For Commercial Construction
1. Have All the Right Control Layers in Place
You need to have all the right control layers in place when you are trying to maintain a building envelope. You need a water-resistive barrier that helps create the main drainage plane. This happens by making sure that seams overlap, shingles are placed correctly, and flashing materials are used correctly. You will also need an air barrier. This is how the air is allowed to move through the wall cavities. This part of your plan needs to allow continuous air movement to limit heat increases and to prevent issues like convection.
You will also need a vapor retarder, which will allow water to diffuse through the materials that are part of the building. This part of the layers of your construction project will be different depending on the weather conditions in your part of the world. Lastly, you will need to have thermal control in place. This will prevent dew points from occurring within your walls.
2. A rainscreen And Flashing Need to be Utilized
You will need to make sure that you have the right air gaps/cavities behind all exterior cladding to make sure that any incidental water will bypass the building’s main structural materials and be drained safely off the building. This system will also need to facilitate the evaporation of unwanted water.
Flashing has to be continuous around windows, doors, and roof intersections. Proper flashing will send water away from the building, not into it. Weep holes will also help in these efforts, and they need to be at the base of masonry or veneer claddings.
3. Waterproofing Processes Must be Consistent
You will need to install perforated footing drains around the foundation. You can surround them with washed stone and filter fabric to keep water away from the foundation, even during the heart of the winter months. All roof runoff should be directed toward a catch basin or the municipal storm drainage system.
Waterproofing membranes should be added to exterior, below-grade walls. You will need a capillary break, such as a polyethylene barrier, between these membranes and the foundation. Moisture should never migrate between these layers and should instead be drained safely away from the building.
4. HVAC Moisture Should be Kept in Mind
The HVAC system in many commercial buildings is extensive. This means that you need to be sure that the HVAC system that is installed is not going to create condensation and other problems that will lead to issues like condensation or pressurization imbalances.
Positive pressurization will need to be maintained so that conditioned air remains inside while untreated and moisture-laden air is kept outside the building. Condensation control can be maintained with vapor-permeable materials that allow for drying. Also, be sure to insulate chilled water pipes so that localized condensation spots do not lead to problems in the wall cavities.
5. Build Per Manufacturer Recommendations
Manufacturers know what their materials need in order to perform optimally. You need to install all of the materials in this guide correctly and per the suggestions of the makers. This can be verified with an inspection or quality testing process. You will want to be sure that you perform tests like air leakage testing and water spray tests to be sure that you are going to have the right envelope in place when the building is close to completion.
Materials sequencing can help the building to maintain an envelope by creating a carefully layered build that will shed water, allow air transfer, and maintain proper indoor conditions for optimal moisture and heat control.
6. Consider Reaching Out to the Manufacturer With Questions
There is nothing wrong with reaching out to the manufacturer of the materials that you are planning to use for your commercial construction job if you have questions. These companies can help you to set up your envelope correctly by advising about how to use their products and about what their products can and cannot do. You should never worry about asking questions about the way that a product performs if you are not already familiar with it.
Remember that companies that create these products are aware that some construction companies might be new to using their products. It is part of their job as a company to help with customer satisfaction on the builder side of the relationship, so that construction companies will want to work with their products again in the future. It’s always better to be safe than sorry when it comes to building envelope considerations.
Building a Commercial Structure That Will Stand the Test of Time Requires Proper Moisture Control
Moisture control can be a big issue if you have never had to figure out how to create a correct and lasting moisture envelope for a commercial building. There are various key steps in the process of maintaining this kind of building protection, but you should have no trouble if you are using top-quality building materials and understand how this kind of moisture and airflow control works.
This guide will help you to be prepared to plan your next commercial construction project without the guesswork for moisture control.
Related: LATICRETE VAPOR BAN Primer W Offers One-Step Moisture Control







