Are modular rooms the answer in post pandemic world

Modular construction has grown in popularity over the past decade as companies appreciate the speed and cost benefits of modular construction. In the post pandemic world, modular rooms are now more popular than ever.
Zonez https://www.zonez.com, a division of Allied Modular https://www.alliedmodular.com, which has more than 30 years of experience, is announcing the launch of its new 10' X 10' modular collaboration suite. The Zonez Collaboration Suite connect easily to the real world by utilizing a proprietary air flow system and fully modular grid ceiling.
Beautiful design meets practical application with the new Zonez Collaboration Suite. "A majority of modular solutions are designed without construction and code compliance in mind. Most manufacturers live in Europe or design IKEA grade products which are offered direct to customers who do not understand code compliance in the US," said Sande Golgart, President of Zonez.
Golgart added, "There are basic requirements that must be met in any room that include a minimum ceiling height, fire suppression and air flow. Most manufacturers do not meet the most basic interior height requirements. I have seen warehouses filled with expensive modular rooms from Europe that customers have spent hundreds of thousands of dollars on that cannot be installed due to these limitations."
Zonez new line of modular solutions now enable companies to buy with confidence. Before you spend money on a modular solution, check to make sure the minimum requirements have been met by your manufacturer. For information about the International Building Code and other code requirements, contact Zonez at sales@zonez.com.
Zonez currently operates out of three facilities across the country.
For interview requests, please contact sales@zonez.com. For more about the innovative Zonez soundproof privacy solutions or to request a quote, click here: https://zonez.com/privacy-suites/

Events
was held January 26th, 2023, Noon to 4 PM EST with Atlanta locals in person and rest of country virtual via Zoom

Read more BELOW

 
January 26th, 2023
The 13th Annual Hybrid Summit was held on January 26th, 2023 Noon to 4 PM EST.

Virtual Women in Construction: Building Connections was held on December 14th, 2022, 1 PM to 2 PM EST via a Zoom. 2023 Virtual Women in Construction TBD.

2023 Virtual Men’s Round Tables

2023 Men’s Round Table #1 will be held Q1, 2023


2023 Virtual Women’s Round Tables

2023 Women’s Round Table #1 will be held Q2, 2023

News

Portman Holdings to develop 800-room Cincinnati hotel

Portman Holdings has been chosen as the developer of the proposed $482 million hotel that will be located near the Duke Energy Convention Center in Cincinnati. Based on an initial design, the hotel will be approximately 26 stories tall and include 800 guest rooms, retail

Spplements/Podcast
See Website for Details

This content (including text, artwork, graphics, photography, and video) was provided by the third party(ies) as referenced above. Any rights or other content questions or inquiries should be directed such third-party provider(s).