The growth of an industrial plant may involve setting up further equipment to increase production capacity or introducing equipment in an existing plant. Such an undertaking may create additional stress for the power supply, even in instances where the present power supply is functioning perfectly well. Prior to deciding on such growth, companies need to know whether their power supply can accommodate the increased load. This is where power system analysis comes in handy.
Why Electrical Assessment Matters Before Expansion
An electrical system that is built for the current installation will not have the sufficient capacity needed for future needs. The installation of equipment without knowing the current capacity will cause cable overload and higher voltage drops.
Assessment assists engineers in understanding the impact that the changes will have on the whole system. Assessment also helps in determining if any existing switchgear, transformers, cables, and protection devices require upgrade.
When considering industrial installations, electric power system studies for industrial plants may be used to determine any possible problems before connecting new equipment. In this case, the company will be able to perform the necessary upgrades based on its schedule and not because of electrical problems.
Key Areas to Examine During Power System Analysis
● Load Flow Studies
Load flow studies analyse the flow of electrical power within the network during regular operation. It assists in determining voltage levels, power flow, and loadings on various sections of the network.
The addition of more equipment to the plant results in an increase in the electrical load demand. The load flow study will assist in determining if transformers and cables can accommodate the new load demands.
● Short Circuit Analysis
Failures happen when there is a connection between electrical conductors or when insulation breaks down. In such cases, very large currents may pass through the system.
Short circuit studies determine the magnitude of these faults in various points of the network. Such data is useful for engineers in verifying the breaking and withstand capacities of the protection devices in use.
What Information Should Businesses Prepare?
A good evaluation begins by having proper information regarding the present setup and suggested changes. Companies need to collect information such as electrical single-line diagrams, rating of transformers, cables and circuit breakers.
Also, specifications regarding the new equipment play an important role. Starting currents for motors, scheduling of operations and expected demand may affect the calculations.
It will be useful for firms intending to estimate capacity of the electrical system prior to expansion of their business to examine such information. In this way, engineering work may become more efficient and lack certain data discovered.
Conclusion
Expansion in an industrial environment needs more than just machinery and space. The electrical distribution systems should be able to sustain the changed operating conditions. Planning a proper power system analysis will help in getting a better idea of the constraints prevailing and the modifications required.
If you need any help with this regard, then please get in touch with Covol Engineering.
FAQs
Is power system analysis needed in all cases of industrial expansion?
No, not every small alteration needs an analysis. Yet, any major increase in power requirements or any modifications to the layout of the network should be analysed by an expert.
What is the frequency of analysis of the electrical system?
Analysis of the system can be thought of each time any large modifications are made to the system. Periodic analysis might be needed as well.
How do load flow analysis and short circuit analysis differ from one another?
Load flow analysis analyses conditions of operation that are normal and include the loading and voltage. Short circuit analysis focuses on analysing the current flowing when faults occur.
Is there enough capacity on the existing transformer for further machinery?
It depends on the available capacity of the transformer, existing demand and the properties of the machinery. An engineering evaluation could assist in determining its feasibility.
Does protection coordination need reviewing following upgrades?
Yes, it does. The fault levels, protective device ratings, and even network configurations are factors that might influence their coordination.