Crews have completed two years of heavy lifting for a $1.47 billion replacement of the Gerald Desmond Bridge, which connects Long Beach, California, with Terminal Island. The structure will be the first cable-stayed bridge in the state and will have a 100-year life span. Read the Daily Breeze story here

