Poettker Construction & VA Engineering Warehouse

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Poettker Construction & VA Engineering Warehouse

Keep up with the latest from CCR-Mag.com

Fill out the form Below


Poettker Construction served as the general contractor to consolidate the service operations of the Jefferson Barracks VA Medical Center into one 67,000 SF facility, creating a distinct service zone for the campus. This central campus hub serves as the processing facility for all receiving, storage and delivery of materials, lines and operations and maintenance services.
Logistics were key to the success of this project. With campus space being very confined, the existing warehouse and medical rehabilitation buildings were abated and demolished before new construction began. A third building, which houses campus’ mechanical systems, remained intact during construction and was later demolished once the new systems are fully operational.
One of the biggest challenges Poettker faced was relocating existing utilities from campus buildings constructed during the early to mid-1900’s that in most cases were not documented on any plans. Our team spent four months in the beginning of the project utilizing modern technology to identify existing utilities and formulating a plan for potential interference during construction. When existing, abandoned utilities were located, Poettker’s team coordinated with facility representatives and proposed a solution to minimize additional tie-in cost and limit the impact to the adjacent facilities, hospital operations and ultimately patient care. The new utilities were rerouted to other functional underground lines to avoid any critical path schedule delays. Boring probes and cameras were utilized to verify that potential re-route tie-in points were free of obstruction. Our team coordinated all new utility connections with the neighboring facilities to schedule our work during their downtimes.
With the goal of reducing energy consumption and costs, extensive daylighting through windows and skylights and clerestories; photovoltaic panels, solar hot water heating panels, and green roof system were incorporated into the project. The building’s exterior consists of both brick masonry and precast concrete construction to match the neighboring facilities and was constructed per Anti-Terrorism Force Protection (ATFP) requirements and to achieve LEED Silver sustainable certification.

Events

Read more BELOW

News

Skanska, Cold Spring Harbor Laboratory Top Out Campus Building

Skanska and Cold Spring Harbor Laboratory (CSHL) celebrated the topping out of the Artificial Intelligence and Quantitative Biology (AIQB) building at CSHL. This marks a key milestone of Phase I of CSHL’s Foundations for the Future campaign that aims to invest in the institute’s infrastructure so

Supplements/Podcast
See Website for Details

This content (including text, artwork, graphics, photography, and video) was provided by the third party(ies) as referenced above. Any rights or other content questions or inquiries should be directed such third-party provider(s).

Receive the CCR 2024 Idustry Report

Get ahead of your Competitors with CCR's FREE Industry Insider's Report 2024!

Always stay two steps ahead of your Competitors. Stay informed with the latest in the Industry. 

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

This site uses cookies to ensure that you get the best user experience. By choosing “Accept” you acknowledge this and that ccr-mag.com operates under the Fair Use Act. Furthermore, Changing privacy laws now require website visitors from EEA based countries to provide consent in order to use personalized advertising or data modeling with either Google Ads & Analytics. Find out more on the Privacy Policy & Terms of Use Page