McElroy Metal’s Metal-Over-Asphalt Recover System

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

McElroy Metal’s Metal-Over-Asphalt Recover System

Keep up with the latest from CCR-Mag.com

Fill out the form Below

The Bricklayers Local 5 of Valley View, Ohio, knew what it was getting into when purchasing a property with two existing buildings, both with failing asphalt shingle roofs. The union’s first order of business after acquiring the buildings was to solve the roofing problem with a more permanent solution and ultimately selected the McElroy Metal 138T symmetrical standing seam system.

The 138T shingle re-cover system was installed on both buildings, one of which would become the union hall and the other would be occupied by tenants.

“The Bricklayers wanted to install a roofing system that could deliver a low-maintenance, long-lasting solution for decades to come because this newly acquired property would eventually become the permanent location for their union hall,” says Scott Froelich, vice president of TEMA Roofing Services of Youngstown, Ohio. “They knew the benefits of a metal roofing system aligned best with their long-term goals. So, the Bricklayers were able to take advantage of our metal installation capabilities and our cost-saving design-build services in order to address concerns for existing dormers on both buildings.”

In regard to the dormers, TEMA worked with an architect to have designs stamped and certified to meet state building code requirements. In all, 10 dormers were removed from the two buildings, helping to tie in the new metal roofing system with a more sleek, seamless overall appearance.

“While most building owners choose a full tear-off and reroof when replacing an old roofing system, a metal-over-shingle recover system offers numerous benefits, both to the owners and the environment,” Froelich says. “No tear-off or underlayment is needed. No underlayment is a significant cost savings and no tear-off means no waste to the landfill. This system also allows for above-sheathing ventilation (ASV) to reduce heat transfer and assist in energy efficiency.”

TEMA installed 13,500 square feet of roofing on one building and 15,100 square feet on the other. The installation included a special detail: one-piece welded stainless steel at dead valley transitions to ensure a weathertight system. The 16-inch wide 24-gauge 138T panels were delivered from the McElroy Metal plant in Clinton, Ill. The color is Sherwin-Williams Fluropon PVDF Medium Bronze. TEMA also installed the S-5! ColorGard snow retention system with two-inch Medium Bronze strips.

About McElroy Metal

Since 1963, McElroy Metal has served the construction industry with quality products and excellent customer service. The family-owned components manufacturer is headquartered in Bossier City, La., and has 13 manufacturing facilities across the United States. Quality, service and performance have been the cornerstone of McElroy Metal’s business philosophy and have contributed to the success of the company through the years. As a preferred service provider, these values will continue to be at the forefront of McElroy Metal’s model along with a strong focus on the customer. More information can be found at https://www.mcelroymetal.com.

Installer: TEMA Roofing Services, Youngstown, Ohio (https://www.temaroofingservices.com)

Completion Date: December 2020

Events

Read more BELOW

 

The 2024 virtual Men’s Round Table will be held Q4, 2024, date TBD.

2024 Virtual Men’s Round Tables

2023 Virtual Men’s Round Table was held on November 7th, 2023 via Zoom.


 

2024 Virtual Women’s Round Table

2023 Women’s Round Table #1 was held on October 20th, 2023 via Zoom

News

Sanzari Completes Multi-Million-Dollar Glenpointe Marriott Project

Alfred Sanzari Enterprises, a preeminent family-owned and operated commercial and residential real estate firm, announces the completion of a capital improvement project at the Glenpointe Marriott, a 351-room full-service hotel located on the company’s Glenpointe corporate campus in Teaneck, N.J. The capital improvement project transformed the hotel’s 39,317-square-foot

Supplements/Podcast
See Website for Details

This content (including text, artwork, graphics, photography, and video) was provided by the third party(ies) as referenced above. Any rights or other content questions or inquiries should be directed such third-party provider(s).

Receive the CCR 2024 Idustry Report

Get ahead of your Competitors with CCR's FREE Industry Insider's Report 2024!

Always stay two steps ahead of your Competitors. Stay informed with the latest in the Industry. 

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

This site uses cookies to ensure that you get the best user experience. By choosing “Accept” you acknowledge this and that ccr-mag.com operates under the Fair Use Act. Furthermore, Changing privacy laws now require website visitors from EEA based countries to provide consent in order to use personalized advertising or data modeling with either Google Ads & Analytics. Find out more on the Privacy Policy & Terms of Use Page