Laminators Inc. Expands Thermolite™ Glazing Panel


In addition to their standard flat Thermolite panel, Laminators Incorporated now offers fabricated options to provide additional R-Value, customization of the reveal created between the panel face and mullion face, and wrapped edges to create hairline joints between panels in butt-glazed applications. Thermolite Glazing Panels are designed to easily fit into any standard or custom glazing system. With building and energy efficiency codes becoming even more stringent, these panels can be a smart solution for your next project.
Thermolite U-Max is a 7-ply, rabbet edge panel designed to provide increased insulation on the interior face of the panel. U-Max increases R-Value by 100-200% (over standard 1” infill panels) and is available up to a 3-1/2” overall panel thickness. Thermolite SE provides new aesthetics with the ability to adjust the reveal created between the face of the mullion and the face of the panel. Various options are available, including 2-4 stepped edges, which can fit into a 1” to 2-1/2” glazing pocket. Thermolite WE edge treatment allows for a metal-to-metal bond when structural sealant is used in butt-glazed applications to create hairline joints. WE has 1-4 wrapped/panned edges and can be ordered up to a 2-1/2” panel thickness. For additional information and free samples, contact us at 800.523.2347 or visit us a www.laminatorsinc.com.
About Laminators Incorporated
Laminators Incorporated, a leading manufacturer for over 50 years, offers of a complete line of composite panels for the commercial construction and sign making industries in the United States and Canada. Laminators’ lightweight systems are exceptionally strong and durable, and provide various application solutions making the panels quick and easy for users to fabricate and install. Laminators Incorporated is committed to providing value through high quality products, innovative application solutions and superior customer service.
Link to article.

Events
CCR NYC September 28th, 2023 Noon to 4 PM at Penthouse 45.
 
The 14th Annual 2024 Hybrid Summit will be held January 2024, Date & Location TBD.

Read more BELOW

January 26th, 2023
The 13th Annual Hybrid Summit was held on January 26th, 2023 Noon to 4 PM EST.

Virtual Women in Construction: Building Connections was held on December 14th, 2022, 1 PM to 2 PM EST via a Zoom. 2023 Virtual Women in Construction TBD.

2023 Virtual Men’s Round Tables

2023 Men’s Round Table #1 will be held Q3, 2023


2023 Virtual Women’s Round Tables

2023 Women’s Round Table #1 will be held Q3, 2023

News

Casino Royale goes big to join Resorts World

The trend in Las Vegas Strip construction has been toward eliminating small hotels and constructing larger buildings that feature multiple brand-name hotels and boutique properties under one roof. The newest is the $4.4 billion, 3,500-room Resorts World Las Vegas, which includes a Hilton, Crockfords and

Spplements/Podcast
See Website for Details

This content (including text, artwork, graphics, photography, and video) was provided by the third party(ies) as referenced above. Any rights or other content questions or inquiries should be directed such third-party provider(s).