AC-Tech Go Early Technology™ 2170 concrete sealant gets workers on top of a newly poured slab and fully productive 3 to 5 days after it is poured… potentially adding more than 14 calendar days back to their construction schedule! This allows for early openings and unanticipated additional day’s sales. AC•Tech 2170™ vapor reduction systems are backed by a 15-year material & labor warranty, and are formulated to withstand up to 100% RH (ASTM F2170) and sustained alkalinity up to pH 14. AC•Tech 2170™ reduces slab curling and cracking, providing a 14,500 psi topcoat for increased slab durability during construction. All this with zero VOC. Go Early = Open Early!
For more info, please visit https://www.actamerican.net.
