Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
CCR Hall of Fame 2026 Inaugural Honorees: meet the 60 doers who built America's commercial landscape
CCR Hall of Fame 2026 Inaugural Honorees: meet the 60 doers who built America's commercial landscape
Featured Partners

apvcoatings logo

Adart

FSU Logo

Finishing the outside of a new build: what to do first

Handover day on a new Perth home usually leaves owners with a house, a sandy block and a long list of outdoor jobs. Doing those jobs in the wrong order is one of the most common and expensive mistakes. Here is a sensible sequence, and the council rules that shape it.

Many new Perth homes are handed over with much of the outside left to the owner. Soakwells, the crossover, the driveway, paths, an alfresco extension, the garden and the turf all become the owner’s problem. Each job affects the next, and some of them cannot be undone without lifting work that has only just gone down.

Start with a plan, not a contractor

Before anyone is booked, it helps to sketch the finished outdoor layout. Where will the patio go? Which areas will be paved? Where do the downpipes come down, and where will that water go? Is the driveway staying at the builder’s width or getting wider?

These answers decide everything that follows, because roof and paved areas both shed water, and in Perth that water has to stay on the block.

Soakwells come before paving

Perth councils require stormwater to be kept on the property. The City of Wanneroo states that owners have a statutory obligation, under common law precedents and the Local Government Act 1995, to confine runoff within their boundaries, and the City of Joondalup uses the same wording. The City of Stirling sizes storage at 15 litres per square metre of impervious area, and stores roof and paved runoff separately. Paved areas count as impervious area in every council formula.

After handover, the soakwells are the owner’s responsibility. Builders often include them as a provisional sum, which can rise if the site turns out to need more than the contract allowed for. Adding a patio or alfresco roof later adds to the catchment too and may mean more soakwell capacity.

The timing rule is simple. Install soakwells once the layout is known, including the patio, the paving and the downpipe positions, but before the paving goes down. Owners who want to understand the sizing can read up on soakwells sized for the roof and paved areas, which shows how council formulas turn square metres into storage.

Councils also restrict shortcuts. The City of Stirling does not allow private connections to its drains unless the owner can prove high groundwater, and the City of Swan prohibits discharging stormwater over the crossover or verge onto the road.

Then the crossover

The crossover is the section of driveway between the kerb and the front boundary. It sits on council land, so it needs its own council application, separate from any work on the block itself. Under the Local Government (Uniform Local Provisions) Regulations 1996, a council must bear 50 per cent of the cost of a standard crossing, as estimated by the local government.

Brick paved crossovers are permitted in the City of Wanneroo, City of Joondalup, City of Swan and City of Stirling, each with its own specification. Wanneroo’s sheet for brick paved residential crossovers asks for heavy duty pavers at least 60 mm thick, a 20 to 40 mm sand bed, at least 100 mm of crushed limestone or rock as a sub base, and edge restraints 250 mm wide and at least 80 mm deep. It also asks for a positive slope of 2 per cent from the kerb to the boundary.

On some estates the developer’s rules add another layer. On at least one LWP estate stage in the City of Swan, the developer installs its front landscaping package only once the driveway and crossover are complete. That makes the crossover a job worth getting moving early.

The driveway and paving

With drainage in and the crossover approved, the driveway and paths can go down. Driveway pavers should be at least 50 mm thick, with 60 mm preferred, and 80 mm for boats, caravans and trucks. They sit on compacted road base under the bedding sand.

Pattern matters on a driveway. Herringbone interlocks in both directions and resists the creep that turning tyres cause. Stretcher bond lines the joints up and can rut under wheels, so it is better kept for paths and patios. A 45 degree herringbone gives the strongest interlock, while a 90 degree layout needs fewer cuts and still suits a driveway.

On new estates it is also worth asking whether the block contains fill, because fill settles differently from natural sand. Some local firms handle the council crossover application as part of the driveway job, and the Landsdale contractor IBP Paving is one of them.

Garden and turf last

Turf, garden beds and irrigation come last, once the heavy work is done and the levels are settled. Laying turf first and then driving a bobcat over it to build the driveway is a familiar way to pay for the same lawn twice.

Getting the order right is not complicated: plan the layout, put the drainage in, lodge the crossover, lay the hard surfaces, then plant. The reward is a front yard that only has to be built once.

Share this post :

Facebook
Twitter
LinkedIn
Pinterest
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
CCR Hall of Fame 2026 Inaugural Honorees: meet the 60 doers who built America's commercial landscape
CCR Hall of Fame 2026 Inaugural Honorees: meet the 60 doers who built America's commercial landscape

Stay close to the industry.

CCR updates, digital magazines, events, and partner insights.

Current Issue — CCR #10

Editorial & Third-Party Content Notice: Articles, press releases, company announcements, and accompanying media (including photography, graphics, and video) published on this site may be provided by third-party contributors, PR representatives, or wire sources as cited. Authorship and original copyrights remain with their respective holders.

Commercial Construction & Renovation is a registered service provider under the Digital Millennium Copyright Act (DMCA). To submit an inquiry, copyright claim, or formal takedown request, you may view our registered agent listing and official contact details via the U.S. Copyright Office DMCA Designated Agent Directory, or contact our compliance desk directly at publisher@ccr-mag.com.

Receive the CCR 2024 Idustry Report

Get ahead of your Competitors with CCR's FREE Industry Insider's Report 2024!

Always stay two steps ahead of your Competitors. Stay informed with the latest in the Industry. 

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

This site uses cookies to ensure that you get the best user experience. By choosing “Accept” you acknowledge this and that ccr-mag.com operates under the Fair Use Act. Furthermore, Changing privacy laws now require website visitors from EEA based countries to provide consent in order to use personalized advertising or data modeling with either Google Ads & Analytics. Find out more on the Privacy Policy & Terms of Use Page and our Editorial & DMCA Notice.